RECONNAISSANCE EXPLOITATION REPORT [RECCEXREP]
LINE 1 — DATE AND TIME______________________________(DTG)
LINE 2 — UNIT________________________________________(Unit Making Report)
LINE 3 — SERIAL ______________________________________(Originator’s Report Serial
Number)
LINE 4 — REQUEST____________________________________(Requestor Identity and
Serial Number)
LINE 5 — PROJECT_____________________________________(Project Identifier Code)
LINE 6 — MISSION_____________________________________(Mission Number)
LINE 7 — DATE________________________________________(Mission Date, DTG)
LINE 8 — ITEM________________________________________(Item Number)
LINE 9 — NAME_______________________________________(Target Name or
Description)
LINE 10 — NUMBER____________________________________(BE Number)
LINE 11 — LOCATION__________________________________(UTM or Six-Digit Grid
Coordinate With MGRS
Grid Zone Designator) of
Sighting)
LINE 12 — TIME_______________________________________(DTG of Sighting)
LINE 13 — STATUS ____________________________________(Status of Activity/Target)
LINE 14 — COUNT_____________________________________(Count of OB Items)
LINE 15 — TYPE_______________________________________(Type of OB Item)
LINE 16 — FURTHER___________________________________(Follow-Up Report:
Yes or No)
LINE 17 — WEATHER___________________________________(Weather Conditions Over
Target)
LINE 18 — IMAGERY CONFIRMS________________________(Imagery Confirmation of
the Pilot Report/Debrief)
LINE 19 — SENSOR_____________________________________(Type of Sensor Used)
LINE 20 — COVERAGE__________________________________(Percent of Target Covered.
If less than 100 percent,
explain why)
LINE 21 — NARRATIVE_________________________________(Free Text for Additional
Information Required for
Clarification of Report
LINE 22 — AUTHENTICATION___________________________(Report Authentication)